Cross Line Laser - SCL-D Special Order Item-Long Lead Time

Cross Line Laser - SCL-D Special Order Item-Long Lead Time
SKU: 1-77-321-STA
Sign up for price alert

Model: 1-77-321
Availability: Yes

$814.00
Calculate Shipping

Description

Details

SCL-D - Beam Self-levelling Cross Line Laser With Plumb

Features:

  • Working range 30m (spot) / 15m (line) - up to 50m with a detector
  • Working environment : Interior / Exterior use
  • Magnetically dampended pendulum
  • Out of true level sensor
  • Pendulum lock for safe transportation
  • Project 2 beams : 1 vertical and 1 plumb
  • Projects 1 horizontal and 1 vertical line to create a cross line (V:130° / H:130°)
  • Pulsed beam mode allows operation outdoors in combination with the detector (supplied)
  • Runs on 3 x AA batteries (supplied)

Specifications:

  • Accuracy (dot): 0,2mm@1m
  • Accuracy (line/rotary): 0,2mm@1m
  • Compensation Range: ± 4°
  • Leveling Time: ≤ 3s
  • Working Range (m): 15m (L) / 30m (D)
  • Working Range / with detector (m): 50
  • Batteries (Alkaline unless otherwise noted): 3 x AA
  • Battery Life (hours): 10
  • Operating Temperature: -10°C > 50°C
  • IP Rating: IP54
  • Screw Thread for Adapter: 1/4
  • Number of Beams: 2
  • Number of Lines: 2
  • Line Directions (Vertical/Horizontal): V/H
  • Laser Class: Class 2
  • Laser Diode(s): 635nm
  • Pulse Mode: ✔
  • Manual Mode: ✔
  • Beam color: red
  • Type (dot/line/rotary): dot/line
  • Levelling Type: Self levelling
  • Beam Direction: Up/Down

Applications:

  • Installing suspended ceilings
  • Overhead lighting
  • Multipoint alignment
  • Tracks and Plumb lighting
  • Partition walling
  • Electrical layout
  • Trunking and pipework
  • Tiling
  • Paneling
  • Wallpapering
  • Kitchen installation
  • Bathroom installation
  • Shelving
  • Cabinets
  • Borders
  • Dado Rails
  • Interior decorating

Reviews

Review this product

  1 star 2 stars 3 stars 4 stars 5 stars
Value
Quality
Price

You may also like

Hacksaw 17" (430mm) 24 TPI High-Tension

Hacksaw 17" (430mm) 24 TPI High-Tension

Code: 20-531-STA
$39.95
Screw Extractor 5Pc J9500A

Screw Extractor 5Pc J9500A

Code: J9500A-STA
$72.60
Combination Pliers 1000V 84-004-S

Combination Pliers 1000V 84-004-S

Code: 84.002-STA
$34.65
Tape Measure 8m FatMax Blade Armour Coating

Tape Measure 8m FatMax Blade Armour Coating

Code: 33-732-STA

Special Price $27.90

Regular Price: $36.00

Rabone Rule Fold Plastic 1301 35.444

Rabone Rule Fold Plastic 1301 35.444

Code: 35-444-STA
$41.03
Riviter Contractor Grade

Riviter Contractor Grade

Code: MR100CG-STA
$43.01
Stanley Tr150Dh Stapler

Stanley Tr150Dh Stapler

Code: TR150-STA
$60.23