Insight Core Module Unit

$4,399.00
SKU
MR301072
Barcode
715959588171

An internet based industrial welding information management solution that will help you be more competitive & profitable. Insight core automatically collects the data you need!

Compatible with a range of miller 14 pin complint, mig & multi-process machines.

Click Here to view Insight Core Brochure

Miller MR301072 Insight Core Module Unit

 

Increase Productivity 

Evaluate key indicators of operator productivity:

  • Measure arc-on time and compare to preset goals.
  • Measure number of arc starts.
  • Optimise resources and get the best use of welding supervisors’ time.

Manage Costs

Monitor and analyse welding costs:

  • Understand weld cell productivity variations.
  • Understand the impact of continuous improvement efforts.
  • Understand weld deposition to determine potential over-welding (Axcess, Auto-Axcess and Continuum power sources and MPa wire feeders only).

Improve Weld Quality

Measure important indicators of weld quality:

  • Identify welds outside of preset amperage and voltage thresholds.
  • Identify operators who may need additional training
  • Weld Trace™ provided for every weld

Who Insight Core Benfits

Weld operators:

  • Provides feedback on performance
  • Identifies training needs
  • Enables operators to make improvements

Welding Engineers:

  • Identifies out-of-spec welds
  • Improves weld process setup and control
  • Monitors power source configuration and performance information

Managers:

  • Improves analysis of weld operator productivity and weld quality issues
  • Helps improve the overall performance of an industrial welding operation

Owners:

  • Delivers accurate, decision ready information in real time
  • Offers an investment that can return significant dividends

 

Identifying common issues from data

Studying the data produced by a welding information system will bring any operational issues to the surface and enable businesses to spot problem areas and trends. There are a number of factors that can impact the efficiency or financial health of a welding operation. These could be managerial, in the welding process itself or in the postweld cleaning. Once these factors have been highlighted, an organisation can make changes that drive positive results such as increased arc-on time or improved deposition and throughput. If a business discovers that their arc-on time and deposition rates are low, there are a number of causes to consider, including:

  • Inefficient weld cell layout
  • Wire feeding problems
  • Parts not arriving at the weld cell on time
  • Incorrect parts delivered to the weld cell
  • Poor part fit-up that creates excessive time spent clamping fixtures and filling gaps
  • Gas flow problems leading to contact tip burnback
  • Downtime for maintenance issues, including liner changeover
  • Rework of poor welds due to porosity or other issues
  • Excessive time spent on post-weld cleanup or grinding
  • Clamping fixtures that need replacing

 

More Information
Model NumberMR301072
gtin715959588171
BrandMiller
Copyright © 2020 Gasweld. All Rights Reserved.